Risks

This page explains the Risks page: what the risk register is, how scoring works, what you can do about a risk, and how the register turns two HIPAA controls green or red.

The idea in one minute​

Your risk register is a list of what could go wrong with your patient data. For each risk you say how likely it is, how bad it would be, who owns it, what you are doing about it, and when you will look at it again.

You don't set the two risk controls by hand. RiskFlow reads the register and turns them green or red, and a failing control names the risk that caused it:

  • A risk analysis is done at least yearly (risk-analysis, 164.308(a)(1)(ii)(A))
  • Risks found are tracked and reduced (risk-management-plan, 164.308(a)(1)(ii)(B))

Two things to know:

  • No risks, no signal. Turning on HIPAA doesn't turn anything red. These controls only move once you add a risk.
  • The readiness score on Frameworks moves with the register.

The old Google-only Risk Assessment page is separate and stays as it is. The signed security risk assessment is a later module.

Who can do what​

RoleRisks
ORG AdminSee, add, edit, score, treat, accept, review, close, reopen and delete
ORG AuditorSee everything. Read-only
Other ORG rolesNo access

A custom role needs the risk-management permission (MANAGE_RISKS) to change the register, and the controls permission to see it. Each clinic sees only its own risks. Another clinic, even one managed by the same MSP, can't see yours, and asking for one of your risks behaves as if it doesn't exist.

Starting fast: Add from library​

Select Add from library to pick from a ready list of about 25 common healthcare risks, such as Ransomware locks the EHR or file shares or A lost or stolen laptop.

  • Risks that fit the systems on your Assets list are pre-ticked. A practice with laptops sees the laptop risk ticked.
  • Each risk arrives with starting scores and is linked to the controls that reduce it, for example Encryption at rest or MFA is enforced, when you have turned on HIPAA.
  • You can add a library risk once. After that the copy is yours: change anything on it. Risks you already added show as added.
  • You can set an owner for everything you add at the same time.

You can also add your own risk with Add risk.

Scoring​

Every risk has two scores. Each is likelihood × impact, both from 1 to 5:

LikelihoodImpact
1Rare1Minor
3Possible3Moderate
5Almost certain5Severe
ScoreBand
1–4Low
5–9Medium
10–15High
16–25Critical
  • Before controls (inherent): if you did nothing.
  • After controls (residual): with what you have in place. Optional. It can't be higher than the "before" score.

The page shows the band of the after score once you set it, and of the before score until then. Only a person sets the scores. RiskFlow never works out "after" from your control status. When a control a risk depends on fails, it asks you to look again instead (see Flags below).

A risk with no scores yet is not scored. That is a problem to fix, not an error.

What you can do about a risk​

TreatmentMeaning
MitigateReduce it with controls
AcceptLive with it, with a sign-off
TransferHand it on, for example insurance or a vendor
AvoidStop doing the thing that causes it

Add a short plan with the treatment if you like. Only Medium and higher risks must be treated. Low risks can sit without one.

Accepting a risk​

Select Accept when the practice decides to live with a risk. You must write a note explaining why, for example Covered by offsite backups and insurance. RiskFlow records who accepted, when, and until when. The acceptance is valid for one year unless you pick another date.

  • The sign-off is kept on the risk and in the audit log. It is not a formal signature.
  • Changing the treatment to something else clears the sign-off.
  • When the acceptance runs out, the risk is a problem again until someone accepts it again.

Owner​

Every Medium or higher risk needs an owner who is on your team. If the owner is removed from the team, the risk counts as having no owner and the control updates right away.

Reviews​

A review means "I looked at this risk again". It records who, when, a note, and the scores and treatment at that moment, so you can show how a risk changed. A review moves the next review date forward and clears any flag.

BandNext review
Critical, High90 days
Medium180 days
Low365 days

Close, don't delete​

Close a risk that no longer applies, with a reason. It moves to the Closed tab and keeps its history. Closed risks never change a control. You can reopen a closed risk. Delete is only for a risk added by mistake.

Flags: a failing control asks you to look again​

Each risk can be linked to controls and to assets. When a control a risk depends on starts failing, for example the nightly Google test finds that MFA is off, the risk is flagged for review with the reason, such as MFA is enforced started failing.

  • A flag is a note for a person. It never changes a control's status, so a control and a risk can't push each other around in a circle.
  • Only a review clears the flag.
  • Linking a risk to a control that is already failing flags it straight away.

How the register drives controls​

ControlFailing whenNeeds evidence when
A risk analysis is done at least yearlyAn open risk isn't scored, or an active ePHI asset rated High or Critical isn't linked to any open riskNobody has reviewed the register for a year
Risks found are tracked and reducedA Medium or higher risk has no owner on the team, is untreated, is past its review date, or has an expired acceptance

When everything is in order, the control is Passing and says how many risks it checked. If another source disagrees, the worst one wins, the same as on Evidence.

Good to know:

  • Only open risks count. Closed risks never drive a control.
  • Low risks and unscored risks never fail Risks found are tracked and reduced. An unscored risk fails A risk analysis is done at least yearly instead.
  • A brand-new register is never stale on day one. The yearly clock starts from the newest of the last review and your oldest open risk.
  • Changing an asset also rechecks the analysis control, so a system that becomes critical and has no risk turns it red.

Passing time changes things too: a review date or an acceptance can run out with nobody touching the page. A step in the daily job notices and updates the control. See Evidence: the daily job.

The heatmap​

At the top of the page, a 5×5 grid counts your open risks by likelihood and impact. Use the Before controls / After controls toggle to see how the risks move once your controls are counted. Select a square to filter the list to those risks. The summary tiles show how many risks sit in each band and how many have a problem, and a link takes you to High and Critical risks with no treatment.

Risks on Controls and Assets​

  • A control's page lists the open risks linked to it and shows when a risk is flagged.
  • An asset's edit drawer lists the open risks that cover it, with an Add a risk for this asset shortcut. The shortcut needs the risk-management permission and an active asset.

Audit trail​

Every change is written to the audit log: compliance.risk_created, compliance.risk_updated, compliance.risk_accepted, compliance.risk_reviewed, compliance.risk_flagged, compliance.risk_closed, compliance.risk_reopened, compliance.risk_deleted and compliance.risks_added_from_library (one entry for the whole add). Flags are written by the system, not a person. Each time a control changes colour because of the register, compliance.control_status_changed is written too.

Good to know​

  • Details of the design are in ADR 011.
  • Tasks, reminders and the signed risk assessment come in later modules.